Level 2 EV Charger Installation:
Everything Long Island Homeowners Need to Know
From panel assessment to permit to first charge β a practical guide for Nassau and Suffolk County homeowners.
Why Level 2 Instead of a Regular Outlet?
Most EVs come with a Level 1 charger β a cord that plugs into a standard 120V outlet. It works, but it's slow: expect 4β5 miles of range per hour of charging. For daily commuting in Nassau or Suffolk County, that means leaving your car plugged in 2β3 days just to go from empty to full.
A Level 2 charger operates on 240V and delivers 20β30 miles of range per hour. For most EVs, that's a full charge overnight. It's not a luxury β for most homeowners with an EV, it's a necessity.
What You Need Before Installation
Before any installation work begins, your electrician needs to assess three things:
Your electrical panel
Most Long Island homes built before 1990 have 100A or 150A service. Level 2 chargers typically need a dedicated 50A circuit. If your panel is already loaded, a panel upgrade to 200A may be needed.
Distance from panel to charging location
Where you park (garage, driveway, carport) determines how much wiring is needed. Longer runs cost more.
Permit requirements
In Nassau and Suffolk Counties, all electrical work β including EV charger installation β requires a permit. Your installer should handle this, not skip it.
Who Buys the Charger?
At Oakland, we do the electrical work β the wiring, circuit, panel work, and installation. You purchase the EV charger itself (the EVSE unit). This means you choose the brand and features that work best for your vehicle and budget. We're compatible with all major brands: Tesla Wall Connector, ChargePoint, Enel X JuiceBox, Siemens, Emporia, ClipperCreek, and more.
Our Current EV Charger Offer
We are currently offering 30% off the installation: electrical labor, wiring, and panel work. The charger hardware is purchased separately, so you choose the brand and model. Ask about it when you schedule your assessment.
What the Installation Process Looks Like
On-site assessment
We assess your panel, determine placement, and give you a transparent quote before you commit. On-site assessment: $149, 100% credited toward your project when you approve the work.
Permit application
We file for the electrical permit with your local municipality. Required in Nassau and Suffolk Counties.
Installation day
Most installs are completed in 4β8 hours. Panel work (if needed) may extend the day slightly.
Inspection & walkthrough
The electrical inspector approves the work. We test the charger with your vehicle and walk you through everything.
π₯ 30% OFF EV Charger Installation β Limited Time
Oakland is currently offering 30% off EV charger installation (electrical labor and panel work; the charger unit is purchased separately) for residential customers in Nassau and Suffolk Counties.
Schedule Your Assessment βReady to Get Started?
Schedule an on-site assessment. We'll assess your panel, walk you through the options, and give you a transparent quote with no pressure. On-site assessment: $149, 100% credited toward your project when you approve the work.
(516) 916-6292